Jackson Hospital South | ICU Renovation
Public Health Trust System /
Jackson Memorial
Jackson Hospital South
Miami, FL
17-122
May, 2018
Work consisted of the build up of a new 5500 SF ICU unit located on the second floor of Jackson South Hospital. Our work included new partition walls, drywall, ceramic tile, acoustical ceiling, wall insulation, fire caulking and painting. The hospital remained fully operational during construction and some of the work had to be performed at night to minimize disruption to the facility. ICRA walls were erected and maintained during the entire construction period. The project was completed on time and within budget.
Subcontractor to Turner Construction
236220
5,500