Owner

Miami-Dade Aviation Department

Building icon

Location

Miami International Airport
Localization icon

City, state

Miami, FL

Contract icon

Contract

MCC 7040 Plan - RPQ: 10248868 WO#9

$ icon

Conclusion

Mar, 2024

Description

The project consists of modification to building 3040 consisting of Task #4 and Task #5 as stated on the construction drawings. Work includes to provide all labor, equipment and material replacing existing fence partition with drywall. Separating the vacant Northeast tenant space from adjacent spaces with a rated demising partition and modify the electrical system. Add a new 6' wide door in the East wall of existing auto parts storage. The scope is based on construction drawings dated 12/2/20 by Designtech International. 

Task #5: consisting of cutting an opening into the existing emu wall to supply/install a new 6' wide double door and paint. 

Task #4: consisting of removal of existing fence and removal of floor fasteners. Place new lintel at top of wall and fill emu cells with grout. Install new fire rated drywall partition, seal penetration and paint. The electrical work consists of electrical demolition of conduits for exhaust fan. New panel, transformer, gfi receptacles, 500 amp circuit breaker and wiring. Test emergency lights. 

Role

Prime

NAICS

236220 - Commercial and Institutional Building

238210 - Electrical and Other Wiring Installation

Size

See additional projects