MIA Building 3094 Stair Structural Repair
Miami-Dade Aviation Department
Miami International Airport
Miami, FL
10206055 WO #12
Mar, 2022
The work consisted of repairing and retrofitting four stairwells in MIA Airport Bldg. 3094 and included permit fees/inspections. Removed all roofing systems from the four stairwells and installed new roofing systems, including all accessories. Repaired and sealed all landings indicated and treads indicated, and/or replaced all damaged stair steel pans, stringers, and ledger angles, and replaced 2 metal doors with frames and hardware. Sealed all concrete surface cracks. Repair and/or replace exposed rebars. Clean all exposed rebars and repair concrete spalls with new cementous materials. Repaired all the damaged joint sealants, precast concrete panels, expansion joints, stucco damage in the stairwells, door frames, cleaned all interior wall surfaces of the stairwells, and concrete with HD detergent. Water pressure on all interior surfaces of the stairwells. Painted the interior walls of the stairwells, railings and hand railings, doors, and door frames.
Prime
5,600
Thank you for your message. We will be in touch accordingly.
One or more fields have an error. Please check and try again.
© EPIC Construction Company, 2023. All rights reserved.